STAGE 1,2,3 and on going
-100mm ring main water and air
- hot water flow and return
- Trade waste drainage to treatment plant
- Stainless chilled water and steam all tig welded
- Glycol lines
- Stainless droppers
- Shed 80 flue ducts
- Connect hot cold air droppers
- High volume hot water units 100mm
- Run alkali and sulphuric acid lines